Showing posts with label resale. Show all posts
Showing posts with label resale. Show all posts

Monday, 10 June 2019

RENOVATION FOR THE D'OUTH HOUSE: Part 2 - Budgeting, Appointing Renovation Contractor, House Design Layout, Painting Scheme, Laminate and Tiling Selection




Table of Contents:
  1. Flat Viewings
  2. Online Research
  3. HDB Resale Flat Purchase Process
  4. HIP Options
  5. HIP Works & Bathroom Fixtures
  6. Renovation Budgeting
  7. Appointing Renovation Contractor
  8. House Design Layout
  9. Painting Scheme
  10. Laminate and Tiling Selection
  11. Hacking Works
  12. Aircon Installation
  13. Electrical Distribution
  14. Lighting Design and fixtures (fans, heaters, oven switch, etc)
  15. Carpentry / Blum Hinges
  16. Door and Door Frame Installation
  17. Windows Installation
  18. Blinds Installation
  19. Non-built-in Furniture (Ikea, Hipvan, FortyTwo, Qoo10, etc)
  20. Household appliances (Fridge, Washing Machine, Dishwasher, etc)
  21. Plumbing (Sinks, Washing Machine, Dishwasher, etc)
  22. Moving Day
  23. MORE TO COME...

6. Renovation Budgeting


k3LPqsFWS7fTce4dRmhCXX

ACTUAL PICTURE FROM THE FLAT LISTING (Source: Ben Fan)

When we first saw the online listing for the flat, I admit that it crossed our minds that it might have been on fire once. Alarmingly, when we did a cursory google search of fires in the area, there HAD been a fatal fire incident in the block in the recent past, befitting of the sales timeline of the flat. At this point, most normal people might run away from such a flat. BUT WE ARE NO MERE MORTALS. Also we were on a budget. How were we ever going to find an amazingly priced flat in the Central region? Possibly by going against the trend by looking for weird flats that might not attract the typical Singaporean buyer. (On the practical end, the majority of buyers in Singapore are likely to be Chinese just based on demographics, so we just had to think of what the typical Chinese buyer might avoid) So we persevered in digging up more on the story, and found that it was definitely a different flat that had been on fire.

ST (19 April 2017): Lighted joss sticks and candles may have sparked fire which killed elderly hoarder

ST (20 April 2017): Fatal fire in flat: Clutter likely hindered woman's escape

We were sorry to read about the Rowell tragedy, but after investigating further: GOOD NEWS EVERYONE, THIS FLAT HAS NEVER BEEN ON FIRE BEFORE! And that totally black Electrical DB box that we thought might been burnt?? It was outdated but actually fine on the inside; it was just that someone had painted it completely black. In any case the flat was not one of those bright cheery viewings poised to sell. It hadn't been maintained in a very long time. The things it had stacked against it were:

  • Located in Little India - which is not typically known a popular area for 'typical Chinese buyers' - and where the ethnic quota system is flipped (Indian quota maxed out as opposed to the usual case of Chinese quota maxed out) - flipped in our favour though, so YAY!
  • Having been on the market for more than 6 mths - garnering very high number of views on all the property listing websites, with signs that it may have been priced at 420 initially but that the price had been lowered - which raised the question of why it hadn't sold for so long? why hadn't someone else seen the value in this humble little flat?
  • Extremely "original condition" - dirt or joss stick/religious paraphernalia smoke marks everywhere, no fixtures, no fittings, might not have been renovated ever since the 80s, kitchen would need to be hacked and completely done from scratch - could we handle or afford doing a very extensive renovation project?

Since it was in a very "original condition", we knew it would require a lot of renovation works. The next step was to try to intelligently guess the cost of the renovation so we could set a reasonable budget of sorts - by thinking of what were the absolute essentials, like having a BED to sleep on, having the electricals done, getting plumbing done, putting in air conditioning, having a kitchen sink, etc. With the caveat that I have never done a house renovation project before, this was the budget I (naively?) drew up to estimate the cost/budget on my side. All the items in Green were considered necessary, the ones in yellow could be substituted by cheaper off-the-shelf alternatives.


Estimated 3 Room HDB Resale Renovation Cost
Living Room
TV - Already have one!0-
Speakers and sound system - already have one!0-
TV Console Shelving500Estimated based on hipvan
Coffee Table400Estimated based on Scanteak
Sofa1000Estimated based on Scanteak
Ceiling Fans300Estimated based on Lazada
Dining Set1500Estimated based on Scanteak
Aircon - System 32500Estimated based on Daikin
Lighting1000GUESS-TIMATED
Bedroom
Kingsize Mattress and Bedframe with Storage (englander)2000Estimated based on Englander
Wardrobe Carpentry4000GUESS-TIMATED
Bedside tables x 2300Estimated based on ikea
Bedside lamps x 2300Estimated based on ikea
Second Room
Ceiling Fan x 2 rooms600Estimated based on Lazada
Study Desks x2800Estimated based on hipvan
Bookshelving Carpentry1000GUESS-TIMATED
Good office chairs x2800Estimated based on Courts
Kitchen
Fridge1000Estimated based on Lazada
Washing Machine800Estimated based on Lazada
Oven1000Estimated based on Lazada
Sink1000Estimated based on hoe kee
Kitchen Cabinet Carpentry15000Estimated based on dingparents
Extras
Painting900Estimated based on moneysmartblog
Professional Cleaning and Polishing Everything800Estimated based on moneysmartblog
Electricals (Moderate)2000Estimated based on moneysmartblog
Hacking (Light/moderate)500Estimated based on moneysmartblog
ESTIMATED TOTAL (SGD)40000

When I cross-checked the number with the very experienced dingparents, they had independently produced a similar calculation (although it was with different line items!!!). Anyway in my case, I thought that this was a reasonable number based on the cash savings I had available after paying the deposit for the house, and with George contributing an equal share this was definitely a number we could afford without overstretching ourselves or emptying out the bank (still able to put aside a reasonable amount of savings for emergencies).

Reality: So.... did we keep to this specific budget in the end? No. Not really if you really go and count all the extra bits we had to get outside of the main contractor works. Insert facepalm. Like any good episode of GRAND DESIGNS (ahem) we ended up exceeding our initial cost and time estimate. We were total noobs at this. But I'll do a postmortem of this later.



7. Appointing a Renovation Contractor


The next major challenge was that we needed to appoint a renovation contractor who could help us with project management and most importantly, the complicated bits in the kitchen - hacking, carpentry, water points, gas, etc. You'll always want to speak to several contractors before deciding on one - as it will be useful to see several versions of the itemised quotation, and to ask all the questions you want about each item they have quoted to understand what they refer to. On a practical note though, it can take a long time to speak to one contractor properly and communicate all your needs accurately, so its not really feasible to speak to every contractor that looks interesting out there - you have to make a shortlist first. We did our research (and the dingparents assisted us greatly with this too) and spoke to 4 contractors in total.

20190510_075004

Example of Itemised Quotations from different contractors

The whole point of engaging a contractor/ID is for their design advice/input. We also didn't want a "yes-man" who would tell us that anything and everything we wanted could be magically built, because we knew that HDB flats have a lot more rules and regulations than private flats. We needed an experienced contractor who could do the project management and also point out where our planned design might encounter issues. Both me and George were working full time as well plus I had a lot of medical appointments and checkups getting in the way of being at the house - which was why we had wanted to hire an ID/contractor to project manage in the first place.

Our Timeline & Reality:
25 Feb 2019 - First meeting with Contractor
6 March 2019 - Contractor visits flat with us
8 March 2019 - Contractor drafted out first draft of agreement
13 March 2019 - Meeting to discuss first draft of agreement
18 March 2019 - Meeting to discuss second draft of agreement
23 March 2019 - Appointed Contractor and signed agreement

It took us 1 month to engage a contractor - from the start of first ever conversation to the signing of contract. Unfortunately, in the middle of renovation works, our appointed ID/contractor went MIA from time to time (uncontactable!!!) and wasn't on site to project manage things at some critical junctions which made it very difficult as subcontractors in the house would ask us what they should do. Confusion ensued and works were delayed as a result because corrections had to be made, and we even had to move to my parents' house temporarily for a few weeks whilst the works were sorted out between our rental and our new flat. If I could do this again, I would have wished for a better project manager...




8. House Design Layout


BUY THE FLOOR PLAN: So you've decided you want to do your own Interior Design. Or part of the way of it anyway. The first step is to purchase your HDB floor plan from HDB - For Existing Flats - which costs $5 so you have this handy little PDF file you can edit in Illustrator. In our case the seller's estate agent actually helpfully gave us a copy of this so we didn't have to buy ours. Anyway, in terms of the timeline, we could have started the process of designing everything from the moment we received the key. Except that we were slowpokes.

Screen Shot 2019-05-05 at 9.30.14 PM

RE-MEASURE YOUR HOUSE: Even with the floor plan, you'll notice that it is nothing like the actual flat you have. So you have to go and measure everything on your own again. This is really crucial. For me, what was useful was this diagram that the dingparents had made. They might not be designers but I'm impressed with all of their meticulous drawings! I'm teaching the Drawing and Illustration module at the moment and I almost want to show the dingparents sketches to the class as an example of how learning technical drawing can still be useful later in life and beyond design school.

DRAW UP A DRAFT LAYOUT: This is where the design phase went a little bit mad, as George preferred to work straight on something that he could view in 3D and VR, whereas my first impulse was to lay out everything in 2D on Illustrator, which I am very fast on.

08-84@200640 - Draft Layout v1 - 27 Feb 2019 - For Contractor

Draft Layout - 27 Feb 2019 (by DBBD)

Screen Shot 2019-03-09 at 12.11.45 PM

Draft 2D of Kitchen - 9 March 2019 (by DBBD)

Screen Shot 2019-03-13 at 3.18.01 PM

Draft 3D Layout of House - 13 March 2019 (by George)

Screen Shot 2019-03-13 at 3.15.39 PM

Draft 3D of Kitchen - 13 March 2019 (by George)

Reality: We got stuck on this for a very long time because we were both working full-time during this time period (I had several exhibitions, having to give talks and speak on panels, plus my full-time teaching job). I found it difficult and overwhelming to start due to a difference in working styles - George preferred working spatially and moving the blocks around in 3D and viewing it with the Vive in VR - but I personally needed to work first from a 2D plan before progressing onto a 3D layout. Also if I could go back in time and tell myself one thing, it would be that there is no need to feel like you have to go to the contractor with a perfect finished design because the design is always changing...



8. Painting Scheme


20190415_193339

We went down to some hardware store near our flat with a big NIPPON PAINT on its signage and copped a feel of their Nippon swatch. After standing there for a VERY LONG TIME (almost as if we were contemplating stealing their giant paint swatch), the man just dug up a slim paint brochure with ALL the colours in it and gave it to us so we could go home and decide on colours at home with the booklet.

There are actually a few types of Nippon Paint available - here in order of price:

- Nippon Paint Matex White - the cheapest generic white - commonly used as the base coat and for ceiling
- Nippon Paint Vinilex 5000 - the standard paint commonly used on walls
- Nippon Paint Easy Wash - the washable paint we specifically requested for

08-84@200640_PaintingScheme_Cropped

Painting Scheme for our flat

Reality: We noted however that during the painting process that the house painters did not use the Easy Wash paint we specifically requested for and instead had used the Vinilex versions of the colours we had chosen!! - so we did ask our contractor to reduce our invoice because Vinilex is cheaper than Easy Wash. Eg: 1 litre of White Vinilex is $20 sgd whereas 1 litre of White Easy Wash is $25 sgd.

20190427_152059

Another thing to note is that things like pipes and door frames will require the shiny Enamel paint. For this we used the Nippon Aqua Bodelac, a water-based acrylic gloss enamel paint, which as you can see from the sample above is a shiny glossy paint unlike our wall/ceiling paints.



9. Laminate and Tiling Selection


Colour Core Laminates for Carpentry


Firstly very early on we chose a laminate colour so we could choose the tiling and other paint colours. This was in a big book of laminates.

20190325_164350

There are many natural/wood laminates with textures such as these. We didn't like these as they were quite artificial.

20190325_164322

The "default" solid colour laminate was something that had a black core like this. We didn't like this as much either.

20190325_164114

We preferred the COLOR CORE range which was more expensive (an add-on) but had the colours we liked, in particular, BABY LEMONADE.

20190325_164314

I don't really know how I could have made our laminate colour choice more obvious... because as the story goes, our contractor GOT THE LAMINATE COLOUR WRONG DESPITE THE ABOVE PHOTO BEING SENT OVER (and the code number being written out) in a text message, annotated on whatsapp, in the google docs, literally everywhere. I must have said BABY LEMONADE all the time as well, which as its name suggests, is a light lemon colour. When it went up, I saw a photo of the laminate, and I thought there had been a blue protective film over the laminate hence it being green from afar, since a lot of things in our house also had a thin blue film over it, such as the windows, the HIP gate and the Ikea furnishings, etc etc). However, it eventually became clear that there was no blue film, and that green was the final colour in the end.



We could have gone all Lemongrab at this point.... "UNACCEPTABLE CONDITION!!!!!!!"

As a result the contractor eventually waived the add-on fee as recompense for this extreme oversight. (They're lucky that we can live with Pistachio Green as a major colour in our brightly coloured haus, otherwise we would have had to reject it and redo it all!)


Kitchen Wall and Ceiling Tiles


A Kitchen for Asian Food in Hot Climate?: Singaporean kitchens are partially wet spaces which are usually fully tiled, unlike the kitchens in London/Europe which are generally regarded as mostly dry spaces with lots of wood and dry fixtures. There's usually at least one gully hole (small gutter for surface water to drain) in the kitchen floor (as well as the toilets), so you could theoretically sploooooge water all over your kitchen (and toilets) with wild abandon because it will drain off, and I was told that Kitchens are almost always fully tiled because of the type of Asian cuisine cooked in houses - which tends to be of high temperature (trying to achieve "wok hei") and generates a lot of oil or spice vapours. To be honest we don't really cook full-on Asian wok style here in our household (we're more.... fusion? experimental?) but we still decided to tile our kitchen fully to suit the local climate and custom.

Fully Tile or Partially Tile?: You can fully tile the walls in your kitchen, or to just tile the visible areas. At first we wanted to do the latter and not tile the area behind the carpentry (because no one will see it). However, in the interest of changing designs along the way, if one selectively tiled the kitchen, this might result in MISSING TILEWORK later on if you decide to change the location of the carpentry or choose to renovate several years down the line. So we decided to fully tile in the end. It didn't cost all that much more.

Size of Tile?: Smaller tiles might mean more grouting lines in the future which might be difficult to clean. Also... according to recent ST and BT articles, larger tiles were equated with a more "condo-like finishing", as well as "construction productivity and efficiency".

Dimensions of our chosen tiles were:
Wall Tiles: 60cm x 30cm (laid horizontally)
Floor Tiles: 30cm x 30cm

Backsplash?: The purpose of the backsplash is functional. In European kitchens I noticed this is the only area that is tiled in order to protect the wall behind sinks and stove from water and oil splashing.

Glass Backsplash?: We contemplated doing a Kitchen Backsplash in tempered glass but then we looked at the cost. Also we would need to predetermine all the placements of the holes to be cut for power outlets once it has been set against the wall, so this would require a lot of advance foresight and planning which we admittedly tend to lack haha. So... no special backsplash! Just the same old good white wall tiles behind the stove area! If you do feel the need though, you can change the tiles to a different one in the "backsplash" area for design purposes, but in any case our entire kitchen is tiled from floor to ceiling.

There are many places to get tiles in Singapore but our contractor uses Soon Bee Huat on Changi Road. We went down to the big tiles showroom at Soon Bee Huat with one purpose, and that was to ask them for a mustard yellow wall tile. Unfortunately, you will find that they are much more normal and traditional than we expected with their selection range. When asked if they had anything yellow, they pointed us to something brown. They did not have ANYTHING close to yellow besides these road crossing tiles, and some pasty yellow-brown floor tiles (not suitable for wall).

20190325_154836

So... er.... who wants some tactile road crossing tiles in their kitchen?

20190325_154905

These yellows and browns are only for floors and not really our thing either. Also far too shiny. We don't like shiny.

20190325_162038

Eventually we decided on big white slab tiles which seemed a sensible and modest choice, along with dark grey-brown tiles for the floor. The big tiles could be grouted with white which would make them sort of fade away into the background. We also brought down the laminate book to compare the tiles with our chosen laminate colour.

20190326_122829

We asked them to cut two samples for the floor tiles so we could take it home and step on them for a while to see how we felt about them. In our very Scientific Tile Test, we also poured old coffee on the tile samples and smeared belachan chilli on them to see which was easier to clean after the stain had dried (plz excuse our very grotty kitchen sink).

20190326_123551

A clear winner for our tile was found!

Our decision: When in doubt just go with neutral colours like completely white wall tiles and dark floor tiles. I don't regret this at all, you can still put in weird colour accents through appliances and fixtures and other things you fill your kitchen with! We were very happy with the all-white wall tile which from a distance looks like it could all be a perfectly contiguous white painted wall. For the floor tile we preferred a tile with the "sandy" feel (as opposed to a shiny waxy feel) and we found that it seemed to clean more easily. The floor tile with a waxy/shiny feel got quite slippery when wet and we felt that oil also clings more to those kinds of tiles.






Coming up next in Part 3: the commencement of works in the house with hacking, aircon, electrical, lighting, carpentry, hinges, doors, windows, and blinds. Phew!

Thursday, 2 May 2019

RENOVATION FOR THE D'OUTH HOUSE - Part 1: Flat Viewings, Online Research, HDB Resale Flat Purchase Process, & HIP Options



The documentation on this blog makes a beeline towards the domestic! For we have begun works on what will probably be two very major long-term projects in 2018/2019 - the first of which is the HOUSE PROJECT, which I thought I should document for the benefit of others who have come after us since we too relied a lot on the power of INTERNETS to find out how to do all this.

The cost of renting a well-located 3-room HDB flat in Singapore actually exceeds that of the cost of a HDB Loan / Mortgage on a 3-room HDB flat (Public Housing), so it was a no-brainer for us to stop renting in Singapore and simply buy a flat here. Naturally, I will start from the very beginning of our search for a flat in Singapore...

Table of Contents:
  1. Flat Viewings
  2. Online Research
  3. HDB Resale Flat Purchase Process
  4. HIP Options
  5. HIP Works & Bathroom Fixtures
  6. Renovation Budgeting
  7. Appointing Renovation Contractor
  8. House Design Layout
  9. Windows Installation
  10. Kitchen Appliances and Sink
  11. Tiling Selection
  12. Aircon Installation
  13. Lighting Design
  14. Electrical Layout
  15. Paint Scheme
  16. Doors
  17. All the rest of the Non-built-in Furniture
  18. Soft Furnishings
  19. MORE TO COME...

1. Flat Viewings


IMG_1406 IMG_1394
IMG_1976 IMG_1412

HDB HEARTLANDS: ER.... NOT REALLY A ROOM WITH A VIEW...

We began our house search by doing viewings in earnest. Or sorta kinda. The first few random estate agents whom we had called up also seemed to know that we were NOOBS/NOT YET FULLY FORMED/NOT ACTUALLY VERY SERIOUS BUYERS because they were as awkward as we were. But the point of flat viewing was to accrue an understanding of the public housing flat formats available in Singapore. In order to ease us into the business of flat viewing, the first flats that we viewed were also in the same block that we were renting, so it was like looking into a duplicate or mirror image of the flat we were in - at least this was something we were a little familiar with and could comment on. (Looking into strangely depopulated duplicate husks of our own flat...)



Source: HDB Website - Types of Flats
Fun fact: Our flat is an older 3A model which is 796sqft (74sqm), meaning our flat is actually larger than the standard 3-Room or 3-NG flat.

Type/Size of flat: Based on our MINI budget we decided to look for 3 room and 3.5 room HDB Resale flats (public housing in Singapore). (This is equivalent to a "2 bedroom flat" in the UK, is usually around 60 to 65 sqm, and has 2 bathrooms). Private/condos were out of the question because I didn't have that amount of savings and also that would be pushing ourselves into a hard financial position. But a very modest HDB flat was definitely within our means.

In my personal experience, I've always felt that the quality of public housing in Singapore exceeds the quality of private housing in London! During the first year I lived in London, I developed the misconception that the housing stock in London was on the whole extremely ancient and backwards because all the rental flats (private flats, bedsits, House of Multiple Occupation types) I had seen and visited were all incredibly run-down compared to the average Singapore flat, featuring interesting details like holes in the stairs, holes in the exterior boundary walls, rickety and unlevel floors, broken windows, cabinets that were falling apart, and rats the size of beer cans. I didn't know any better at the time, so I very joyfully accepted whatever I could get, leg through the stairs be dammed, nothing could dampen my enthusiasm for living in these weird houses!

And then at some point I visited a friend's council flat (bought with a generous gift of a deposit paid by parents - a financial feat otherwise impossible in this lifetime for someone working in Design/Advertising in Shoreditch at the time ahem...) and I was surprised as to how similar it was to a normal Singapore flat. SO, NORMAL FLATS EXISTED IN LONDON. But then, there aren't really a lot of council flats to go around. So people are just being screwed by the awful private rental market in London, where the price of rental is extremely high and what you get is very little. It also feels like part of UK government welfare goes straight into subsidising private landlords because of the housing benefit payout, which doesn't go towards really solving any of people's problems. I suppose it would be more accurate to describe London housing as possessing both extremes - a wide range of extremely nice and architecturally interesting flats (aspirational Georgian front rooms! eco-homes! historical houses! art deco! or industrial/warehouse conversions???) and extremely terrible flats (a lot wider than the range of flats you would get in Singapore). Somehow, although the diversity of types of housing in London is so much wider, this also has somehow meant that the average standard of the affordable London flats is far lower than the average standard of the affordable Singapore flats...)

For public housing in Singapore we had the option of either BTO (Built-to-order) or Resale. It would take an estimated 3-5 years to wait for a Build-to-Order (BTO) flat because you would have to register first and wait for the flat to be built! That also would mean 3-5 years more of interminable renting, plus I was only eligible for a 2-room BTO under the Singles (Non-Citizen Spouse) scheme, so we went straight into focusing our energies on looking for a 3/3.5 room Resale flat (I'd be 'sole owner' under the Non-Citizen Spouse Scheme, George would be my 'essential occupier', and we would still receive a housing grant of S$25,000).

Agent/No Agent: Next, there was the question of whether we would work with an estate agent or not. The good thing about an agent is that they can do all the leg work and arrange for multiple viewings in one evening. However, you run the real risk of it being a sort of psychological game, where the highs and lows of the tour experience may have been designed by the agent to convince you of the virtues of a particular flat, by contrasting different elements, such as seeing a flat with strange or extreme modifications, followed by a normal boring flat, and then another strange flat with a crazy saxophone player outside it who toots away every evening [REAL INCIDENT] - by contrasting an ordinary flat with a TERRIBLE FLAT it obviously helps to make even the most ordinary flat seem a little better than it really is. But hey, we aren't really wanting to see the worse case scenarios here when searching for that dream house...

Criteria: After many viewings, we devised our own criteria for what we were looking for. We liked things like the old terrazzo that often came with old flats, but not TOO CRAZY COLOURED. We were also very particular about the view. We liked either a city view, or a nature view, but not really a suburban view. It also seemed that some people liked being able to see their cars from their flat, so they enjoyed seeing a view of a carpark, but we were not those people. A lot of the "FULLY FURNISHED MOVE-IN IMMEDIATELY" type flats were not our style, so their fully furnished nature was not a plus point for us either.

IMG_1720

Big Terrazzo!

IMG_1701 IMG_2036

IMG_2101 IMG_1569

So many different Terrazzos in HDB Flats!

* George also pointed out that it was quite odd to him that both me and Dingmother always started talking about visibility of ANTS whenever we looked at surfaces and that maybe people in other countries did not have "VISIBILITY OF ANTS" as a criteria for flooring/countertop colours. But we have so many different ants here in Singapore. CAN WE SEE THE ANTS WHEN THEY ARE WALKING OVER THE FLOOR? THAT IS A SERIOUS QUESTION! [And for those living in cold non-tropical ant-less countries who have never thought about whether ants will be visible on your floor or countertop, the answer is: Yes, yes, I would actually like to be able to see the ants. I do want to know where the ants are. I WOULD LIKE MAXIMUM ANT VISIBILITY!!]

Seeing a lot of the same size of flats gives you an idea of the possible fittings, layouts and modifications of that type of flat. For example, we viewed a lot of 3.5 room flats in the AMK area and these were always the ones that received an upgrade of an additional room at the end of their flats. A lot of them had reconfigured their walls in different ways, such as by knocking down the store or hacking down walls and erecting different walls to make different shapes, which gives one ideas about the possible iterations on the same template...

On our individual efforts, as well as the help of an agent for some part, and the Dingfather (our honorary agent for a while), we saw a grand total of 22 flats before finding the ROWELL FLAT.

What we chose: See a lot of flats on our own with no fixed agent


2. Online research


IMG_1676

The view from the only flat that we really liked in AMK...

Unfortunately, all of the flats that we 'kinda' liked in Ang Mo Kio were on the pricey side (nearly 400k / over 400k) which really could not really be justified because it was just so far away from Fun Things in Town and it might result in us having a very socially isolated existence. Some other flats we saw had red flags, such as CCTV cameras being installed everywhere (for what reason did the owner justify to HDB on the installation of CCTV? loanshark? private dispute? etc), weird looking doors and doors which could not be unlocked (was this really a home? why were rooms inaccessible to potential house viewers? why had these unusual office/industrial/shop doors been installed into the residential apartments?), very low floors (potentially affected by smoke from the incessant burning of taoist offerings, and noises from roads, funeral trumpets, construction sounds, schools, etc). All in all, its just not that cheap to buy a flat in the heartlands! And more crucially, some of these flats were older than me (a few were over 40 years old), which could result in loan issues (if you buy or take over a flat with less than 60 years, the housing loan may be disallowed) - and in the distant future, by getting an extremely old flat, we might deprive ourselves of the option of being able to sell and buy a different flat if we so wished to...

George found Edgeprop's website which had a useful map detailing the per square foot cost of all the public housing in Singapore - Edgeprop Analytic Heatmap - which gave us a better picture of the prices in different areas of Singapore, and which areas tended to have the lowest per square foot pricing. AMK Central was far from being the the cheapest zone despite being so far away from the town area.

Screen Shot 2019-05-02 at 1.41.28 PM

Inspired by a visit to a friend's house in Little India (an area that both me and George were extremely fond of) we began looking at the lowest price per square foot that could be had in the Jalan Besar District. And to our surprise, there was a unit on the market that seemed to fit all our criteria! It even seemed to overlook my old flat in Rowell Road!

Screen Shot 2019-05-02 at 1.40.54 PM

Source: Edgeprop Analytic Heatmap

Screen Shot 2019-05-02 at 1.49.40 PM

FUN FACT: Our transaction is reflected on this list (screenshot taken in May 2019), and yes we did get the best per square foot price for our size of flat. Singaporeans familiar with the square footage of flats here can probably easily guess which one was our transaction...

FUN FACT 2: The HDB flats on Kelantan lane average about 450 upwards psf to even 500+. As for Rowell Road, the road that I have the most emotional attachment to, it turns out it is the cheapest price per square foot in the whole Jalan Besar area. Well fancy that!...


Thanks Singaporeans with your racially suspect CMIO policies which has resulted in the Indian enclave near central becoming less popular with Chinese buyers - thus giving us (I'm classed as a Chinese buyer) a chance to find the most favourable price! Your loss is our gain!

What we chose: Little India with per square foot prices as low as SGD 420-440 psf


3. HDB Resale Flat Purchase Process




Buying Resale Flat Steps

Here is a record of our timeline. It took 5 months & 6 days (159 days, not including end day) from start to finish - calculated from the date we applied for the eligibility letter, to the date we completed the purchase.

20 April 2018 - Applied for HLE (HDB Loan Eligibility) Letter
27 April 2018 - Received HLE Approval (which will also tell you what is the max loan possible / what is your max budget)
18 May 2018 - Registered Intent to Buy
** WE THEN COMMENCED THE WILD VIEWINGS UNTIL THE ONE TRUE HOUSE WAS FOUND **
13 June 2018 - First viewing of the Rowell Flat
14 June 2018 - Second viewing of the Rowell Flat. Made offer.
15 June 2018 - Obtained Proof of Ownership from Owner.
25 June 2018 - Owner issues the OTP (Option to Purchase) Form
26 June 2018 - Request for Value Submitted
15 July 2018 - Exercise Option to Purchase (Seller completes portion of form)
16 July 2018 - Submission of Resale Application (Buyer completes portion of form)
20 August 2018 - Acknowledgement of Resale Documents (Confirmation of Purchase of Resale Flat, Housing Grant Agreement, Application of Housing Loan), Payment of Conveyancing and Caveat Fees. [Additional: in our case the seller wished to bring forward the date for Completion of Sale due to travel plans so we also arranged for an earlier date]
26 Sept 2018 - Completion of Sale at HDB Hub, Opening Utilities, SLA Caveat, Property Tax

* I wish to also add the note that when you go down to HDB Hub for the final completion, you don't really have to bring any other documents previously submitted, besides your original IDs. Its a formality in which buyer and seller just sign the final papers in each other's presence, the seller get a cute little HDB tote bag full of papers and HDB branded keychains and magnets and swag, and then you go off with the keys. Unfortunately, about 5 minutes before I was to leave the house to attend this momentous event, I became convinced that I needed to bring the original copy of some document that I couldn't recall whether it should be in my possession or the seller's possession. The result is that I tore through the house like a mad person tornado of flying papers (I realised later that the original was with the seller), and I went to HDB Hub in a nervous wreck - only to slowly realise that the completion was more a formality of signing and shaking hands and smiling at each other and receiving the keys... OH WELL NOW WE KNOW.

On hindsight, there are also three other VERY IMPORTANT things that you'll need to do as a new home owner (but no one is going to remind you to do these):

  • Conservancy Charges: Set up giro/direct debit for conservancy charges to the town council (you'll have to contact your town councils after 2 weeks, or in my case, if you forgot to contact them, they will send you a bill for your overdue conservancy charges ho ho ho)
  • Change of address: Change your registered address to the new one anytime within the next 3 months (or in my case, SUDDENLY PANIC ABOUT THE POTENTIAL ADMINISTRATIVE BOO-BOO YOU MAY OR MAY NOT HAVE CAUSED BY ACCIDENTALLY FORGETTING TO DO IT FOR SEVERAL MONTHS AND RUSH IMMEDIATELY TO THE POLICE POST TO CHANGE IT IMMEDIATELY SO HELP ME OH GOD)
  • Renovations: Start your house renovations so you can move into the flat! DUH. But because I was so busy with my PYT show and the 'accidental commencement of MAJOR LONG-TERM PROJECT #2' I admit that I was unusually slow to start the renovation process....


4. HIP Options


We were extraordinarily lucky in that the HIP timing coincided with the time we were purchasing the flat, meaning that I had taken ownership of the flat in time to make the decisions on what HIP options I wanted.

HIP stands for Home Improvement Programme (HIP), and HDB flats of a certain age are all slated for this programme in which their 30+ year old plumbings and toilets are replaced, spalling issues and leakages are fixed, and safety features like anti-slip coatings, handlebars and mobility ramps are installed for the elderly who need them - all for what is a mere token sum (if you are Singaporean the costs are almost negligible and can be paid through CPF in a few years time). You also get a new front door and front gate (optional Ease items)



The HIP contractor will erect a toilet showroom that looks like this masterpiece below (with a bow on the toilets), and you get to choose from a few inoffensive colour themes such as grey, blue, or sand...

20170829_095931

20170829_095858

The HIP works are usually accompanied by great upheaval in the block itself, with everyone taking advantage of the chaos to embark on their own noisy renovation projects as the HIP works sweep through the block for the duration of the better part of a year. I must admit that I subconsciously ended up delaying the renovation of our flat because of the knowledge that HIP was coming soon and it would have been ideal to move in after HIP had been completed for our flat, otherwise we would have to endure another round of having to trot down to the common toilets during the shock of the 10-day disruption.


5. HIP Works & Bathroom Fixtures


In Feb 2019 the HIP Works finally commenced! We received a one month advance notice letter and a two week advance notice letter before the date, and someone came around to check the condition of the flat before we started, and where they pointed out to us a few weird parts of our flats.

20190130_140543

Seems like all the flats in the block have a slightly un-aligned kitchen toilet door. But no big deal... *TWITCHES*

20190225_081449

Based on the option form given back in October 2018, they printed out the list of works to be done in the house. With the works commencing, we also had to ensure we had all the new fixtures present for them to install during the process. We visited all the usual megastores for bathroom fixtures in Singapore such as Bathroom Warehouse, Hoe Kee, Sim Siang Choon, but ultimately decided to try the smaller bathroom fixture stores on Geylang. After doing a price comparison with HomeOne and Universal Union, we eventually bought our fixtures from Heritage Bathroom Gallery (we were served by a lady called Irene Chong).

Untitled Untitled

As the sink and WC were provided by HIP, we just had to supply the rest of the basic fixtures found in a bathroom. Here is a breakdown of the unit prices for which we got our basic fixtures (after comparing at least 6 different shops):

  • Mirror Cabinet with Internal Shelving - $118 (we chose one that was big enough to hold an entire Listerine Bottle)
  • Instant Heater with Rain Shower, Standard Shower, and DC pump - $249
  • Foldable Towel Rack with additional hooks - $88 (we had seen similar units for over $100 elsewhere)
  • Two way Tap - $33 (we had seen the same unit sold elsewhere in Geylang for $45)
  • Hooks in a row - $42 (we had seen the same unit sold elsewhere in Geylang for $53)
  • Toilet Paper Holder - $28 (we had seen the same unit sold elsewhere in Geylang for $39)
  • Bidet Sprayer - $39

Other things we got separately from Ikea:

  • Glass shelf - $12.90 (We didn't fancy any of the designs we saw in the bathroom shops - too fancy! - and we wanted something even simpler. We also weren't sure if this was absolutely necessary, so we got a cheap backup one with an extremely simple design in case we changed our minds about not having a simple glass shelf)
  • Toilet Brush - $9.90 (Don't really need a fancy branded toilet brush considering that its something we'll use and replace over time!!!)

20190225_163550 20190307_121502

HIP usually finishes within 10 days and the owner just has to be present on the 1st day, 9th day (when the fixtures go up), and last day (where the entire construction team will come up to take a congratulatory picture with you upon the completion of your brand new TOILETS.



In Part 2 of this post I will continue with how we figured out a budget, design layout, and the all important task of appointing a main renovation contractor!